Joint Development
Assessment Panel – Proposed Solar Photo Voltaic Power Facility
LOTS 3899 & 105 MULLERING ROAD, CATABY
Location: Lots 3899
& 105 Mullering Road, Cataby
Applicant: Wind Prospect on behalf of Trustpower and M
Glasfurd Nominees & J Dermer
Folder Path: Development Services Apps / Development
Application / 2016 / 40
Disclosure of Interest: None
Date: 9 August 2016
Author: Manager
of Planning
Signature of Author:
Senior Officer: Deputy Chief Executive Officer
Signature of Senior Officer:
PROPOSAL The proponent is seeking planning approval for up to 80
megawatt photovoltaic (PV) solar power generating facility within the proposed
Waddi Wind Farm, the solar array will be located on Lot 3899 and is the subject
of this planning application. The solar array will feed into a proposed
substation located on Lot 105. The substation has current planning approval,
however is subject to a current amendment to the wind farm planning approval to
relocate onto Lot 105. The application is required to be determined by the
Midwest/Wheatbelt (central) Joint Development Assessment Panel (JDAP).
BACKGROUND The
planning application is for a solar photovoltaic (PV) facility and associated
infrastructure with the capacity of up to 80 MW. The project would be located
on land currently used for grazing and / or cropping and located within the
boundary of the Waddi Wind Farm project which was issued a planning approval by
the Shire of Dandaragan in 2012 and renewed in April 2015. The project would
supply energy to the Waddi Wind Farm on-site substation from which energy would
be exported to the South West Interconnected System. The main access to the
Waddi Solar Plant would be from the Mullering Road using existing farm tracks
located on the property and/or accessways constructed as part of the Waddi Wind
Farm. New short augmentations to the existing tracks may be required to access
the Waddi Solar Plant site. The Waddi Solar Plant would export electricity
through a new distribution line (indicatively at 33kV) which would be either an
overhead line or underground cable that extends from the solar plant site
directly towards the proposed Waddi Wind Farm on-site substation located to the
north-west of the solar plant. Located within the proposed solar plant site
would be arrays of solar photovoltaic panels totalling up to 80MW in capacity,
internal access tracks, underground cables to connect arrays of photovoltaic
panels, solar monitoring stations, inverters, an on-site substation,
maintenance and control building and perimeter fencing. The proposed 150ha
solar plant site is located on a private land title which is 1228ha in area and
hosts typical farm residences and infrastructure including outbuildings, sheds,
dams, fences and gravel farm tracks. This land title is operated as a farm in
connection with other land titles in the region together totalling over
3,400ha. The proposed 150ha solar plant site is mostly cleared of native
vegetation as is much of the surrounding land on the host land title. The land
is used predominately for livestock grazing, cropping and plantations. Where
vegetation does remain, it is limited in extent to isolated patches, scattered
trees and linear wind breaks on private land, and linear strips along the
Mullering Road reserve. Waddi Wind Farm Pty Ltd has a planning approval to
construct up to 12 wind turbines, including all associated infrastructure, on
the same land title. The proposed 150 ha solar plant site is adjacent to the
Minyulo Nature Reserve to the east and is over 7.7km south-east of Badgingarra
National Park. The Minyulo Brook is located approximately 1.1km south of the
solar plant site and is both a waterway and a registered Aboriginal heritage
site (ID 28326). Other surrounding land is generally cleared agricultural land
with patches of remnant native vegetation. The proposed solar plant site is
relatively flat with only a 50m variation in elevation across the proposed
150ha site. The soils within the proposed solar plant site consist of sandy
gravel. Preliminary investigations have indicated that the ground is suitable
for the construction of the proposed solar plant project. The route for the
distribution line is cleared of native vegetation except for the Mullering Road
reserve where remnant vegetation remains. Clearing of this vegetation will be
avoided by use of an overhead line that spans the road reserve. The
construction of the proposed Waddi Solar Plant is expected to take between 12
to 15 months and employ up to 100 people at the peak of construction.
Timeframes and employment numbers would be proportionately less if the project
is constructed in stages. While construction may occur in parallel with the
construction of the proposed Waddi Wind Farm, planning approval is sought for
construction of the solar plant independently of the Waddi Wind Farm. The
project would require approximately 2,200 truck movements to the site however
no oversized vehicles requiring escort or modifications to existing road
conditions are expected to be required.
A Traffic Management Plan would be prepared ahead of the commencement of
construction in consultation with the Shire of Dandaragan and Main Roads WA to
confirm transport routes and undertake a road condition survey to facilitate
the maintenance of public roads. Once operational it is expected that
operations staff would be responsible for maintaining the Waddi Solar Plant.
Maintenance of fencing, weed management and other specialist services may be
contracted out, locally where possible. The Waddi Solar Plant could be operated
for over 20 years with refurbishment occurring as required to facilitate
project life of 75 years or more.
COMMENT The
subject land is currently zoned ‘Rural’ under the Shire’s Local Planning Scheme
No. 7 (LPS7). The adjoining land uses are also zoned ‘Rural’ with the exception
of the adjacent lot to the east, Minyulo Nature Reserve, which is reserved for
‘Conservation’ purposes. The proposed PV solar power facility is a use not
specifically mentioned in the Zoning Table.
As such the Local Government may:
a) Determine that the use is consistent with the objectives of the particular
zone and is therefore permitted;
b) Determine that the use may be consistent with the objectives of the
particular zone and thereafter follow the advertising procedures of clause 64
of the deemed provisions in considering an application for development
approval; or
c) Determine that the use is not consistent with the objectives of the
particular zone and is therefore not permitted;
The objective for the Rural zone is follows; “to provide for
a range of rural activities such as broadacre and diversified farming so as to
retain the rural character and amenity of the locality, in such a way as to
prevent land degradation and further loss of biodiversity.” More specific
guidance is provided in the Shire’s draft Local Planning Strategy which was
adopted by Council for advertising on 28 July 2016. Previous approvals for
solar farms (Emu Downs) have been determined by the Joint Council and
Development Assessment Panel as meeting the above objective. The following
sections of the draft Local Planning Strategy support such applications;
Table 4: Actions – service infrastructure Action - Assess applications for wind
farms and other alternative energy infrastructure, having regard to visual
landscape issues and other relevant
matters set out in Planning Bulletin 67 – Guidelines for Wind Farm Development.
5.4.3 Alternative Energy There is significant potential for the Jurien Bay
region to become an important area for renewable energy production projects.
Wind power generation is already proving to be popular within the Jurien Bay
hinterland with several projects in operation or planned. The first WA utility
scale solar photovoltaic farm is also been developed north of Jurien Bay
confirming the potential for solar power in the region.
There is adequate power generation within the region but the key issue for the
shire is the transmission and distribution of power. The investment by energy
producers in the shire may encourage energy intensive agricultural or other
industries that use significant amounts of energy to locate in the area. In
addition, the Rural Planning Strategy 2012 which will be superseded by the
draft Local Planning Strategy supported such proposals as stated in Objective 4
of section 7.4.2.1 of the Strategy: “Support appropriate non-rural uses where
they are compatible with adjoining and nearby rural uses, environmental
attributes and landscape to complement the primary productive use of the land where
a site contains remnant vegetation and other environmental features or lacks
realistic potential for agricultural use the Council will consider the proposed
non-rural uses as the predominant use on its merits.” It is considered that the
solar farm will not affect the rural landscape or its agricultural pursuit, as
it is comparatively a small portion of the rural lot to be utilised for the
project.
The landscape surrounding the proposed solar plant location features numerous
existing man-made structures including overhead transmission and distribution
lines, the existing Cataby substation, mining operations and associated
infrastructure, public roads and farm infrastructure including buildings and
fences. An existing planning permit is in place for the development of the
Waddi Wind Farm which would include the construction of wind turbines, access
tracks, underground cable, an overhead transmission line, an onsite substation
and a facilities building, all in the direct vicinity of the proposed solar
plant site.
The proposed solar plant would be integrated with the Waddi Wind Farm to create
an integrated renewable energy project creating synergies during both
construction and operation. The height of the proposed solar plant arrays are
less than 3 metres and located on a relatively low lying portion of the land
title minimising visibility from surrounding areas. The proposed solar plant is located over 6km from the Brand
Highway, the main arterial road linking Perth to Geraldton, and may therefore
be only fleetingly visible by passing traffic through road side vegetation and
plantations.
The Walyering Road adjoining the proposed solar plant site to the east and the
Mullering Road located 1.4km to the north both host local traffic only and
comparatively low traffic movements. Views from these local roads will also be
limited and screened by roadside vegetation. The Minyulo Reserve located to the
east of the solar plant site appears seldom visited (as evidenced by the
condition of the access track) while the vegetation within the reserve is
likely to screen the visibility of the proposed solar plant from the east and
south. Impact on agricultural use of land the proposed 150ha solar plant site
comprises less than 12% of the land title on which it is located and less than
5% of the total farm area owned by the proprietor of the land title. As a
relatively small proportion of the overall farm area, the proposed solar plant
will not have a significant impact on ongoing agricultural operations. The
proposed site for the solar plant was selected to minimise the effects on the
use of agricultural land by rationalising land-take areas, positioning the site
at the eastern periphery of the land title and in a location that facilitates
use of existing farm tracks as well as access tracks that would be constructed
as part of the Application for Planning Approval Actions to prevent and control
the spread of agricultural weeds and plant disease to uninfested areas would
include identification of risk species occurring in the region and potentially
infested areas that may be traversed, implementing hygiene procedures where
required (such as vehicle blow-down) before entering uninfested sites, sourcing
outside materials from low risk sources, monitoring site access tracks to determine
any new infestations, and carrying out appropriate remedial actions in the
event that an outbreak occurs. Inconvenience to landowners and their normal
farming activities will be minimised through consultation and forward planning.
The construction project manager will endeavour to work with landowners to
determine those periods when certain farming activities must be carried out,
and construction activity timing and procedures will be tailored to meet the
affected landowner’s needs as much as possible. The landowners will be updated
on a regular basis regarding construction activity procedures and programming.
The solar plant is proposed for an area with relatively low population density
to minimise any potential visual impacts. The location of dwellings most
proximate to the proposed solar plant site are shown in Attachment 7 with
distances detailed in Table 3 below. Due to the distance between the proposed
solar plant site and existing dwellings and with existing screening from land
contours, plantations, roadside vegetation and vegetation within Minyulo Nature
Reserve, the proposed solar farm is unlikely to be substantially visible from
any of the dwellings listed in Table 3
Built structures proximate to the proposed solar plant site include the underground
Dampier to Bunbury Natural Gas Pipeline (DBNGP) and Western Power distribution
lines, both shown in Attachment 1. The DBNGP is located 1.7km to the north east
of the proposed solar plant and will not be impacted by any proposed solar
plant infrastructure. The applicant will consult and negotiate with Western
Power to ensure there is no unacceptable impact to Western Power
infrastructure. Reflection or glare from photovoltaic solar panels is minimal
as they are designed to collect and absorb sunlight, not to reflect it. No
issues have been identified by aviation stakeholders consulted and it is noted
that photovoltaic solar panels are installed at airports in Australia and
around the world. The following factors will ensure that the construction and
operation of the solar plant project will not create an unacceptable fire
management risk: - The proposed solar plant site is cleared farmland. - Cables
connecting the PV arrays within the solar plant site will be located
underground. - There is very good access to the proposed solar plant site;
Given the above information, it is the Planning Officers recommendation that
Council support the proposal with recommended conditions to be presented to the
Joint Midwest / Wheatbelt (Central) Joint Development Assessment Panel for this
application.
CONSULTATION In
addition to the Shire advertising and consultation process, the applicant
undertook an advertising and consultation process and has advised; Notification
of the Waddi Solar Plant proposal inviting comments and further engagement has
occurred with key stakeholders including approximately 26 state, federal and
local government agencies, 14 private sector organisations, 9 community groups,
10 State and Federal members of Parliament and the owners of all properties
involved in and proximate to the Waddi Solar Plant project. Further engagement
and consultation occurred with many of these stakeholders. The consultation
process commenced towards the end of 2015 and is ongoing.
This notification and
consultation has consisted of:
§
Letters addressed to specific stakeholders advising of the proposed project
distributed by email and/or mail
§
Newsletter and a fact sheet distributed by email and unaddressed mail to
mailboxes at the Badgingarra and Dandaragan post offices;
§
Face-to-face meetings and discussions with some government agencies and
interested neighbouring residents;
§
Invitations to the Information Days distributed by email, unaddressed mail to
mailboxes at the Badgingarra post office and available on the counter at the
Dandaragan post office;
§
Advertising of the Information Days in 4 local publications leading up to the
Information Days, and posters displayed at 3 prominent community congregation
points (Badgingarra and Dandaragan post offices and Shire of Dandaragan
Council) and advertised by the Shire of Dandaragan on their website and
Facebook page;
§ The
Information Days held at the Dandaragan Community Centre on 14th and 15th
April; and
§
Launching of the updated www.waddiwindfarm.com.au website on the 31st March
2016 which contains information about the Waddi Solar Plant. Copies of the
newsletter, fact sheet and general correspondence sent to stakeholders are
provided in the attachments.
No written stakeholder responses were received specifically
in relation to the Waddi Solar Plant project. As recommended in the Environment
Protection Bulletin No. 21, consultation has occurred with the Department of
Environment Regulation Noise Regulation Branch and the Department of Parks and
Wildlife. As the Waddi Solar Plant project progresses, engagement with
stakeholders will be ongoing using newsletters, letters, emails, meetings and
updates to the website. The Shire of Dandaragan undertook to advertise the
proposal to all landowners that had property within 5km of the subject site
boundary. This included landowners that had only portion of land within 5km.
Advertising commenced on 12 July 2016 until 8 August 2016. A couple of late
submissions were accepted as prior notice had been given.
The proposal was also advertised in the local newspapers
circulating in the district and to the following government organisations.
§
Department of Water;
§
Wheatbelt Development Commission;
§
Western Power;
§
Western Australian Planning Commission
§
Royal Australian Air Force Combat Support Unit;
§ Main
Roads Western Australia;
§
Landgate;
§
Department of Fire and Emergency Services;
§
Environmental Protection Authority;
§
Department of Regional Development State Land Services;
§
Department of Environment Regulation
§
Department of Planning;
§
Department of Lands;
§
Department of Industries and Resources;
§
Department of Health;
§
Department of Parks and Wildlife;
§
Department of Mines and Petroleum;
§
Department of Defence;
§
Department of Agriculture and Food;
§
Civil Aviation Safety Authority;
§ Air
Services Australia;
§
Shire Officers. Responses are provided in the Schedule of Submissions in the
Attachments.
STATUTORY ENVIRONMENT
§
Local Planning Scheme No 7.
POLICY IMPLICATIONS
§ SPP 2.5 Land Use Planning
in Rural Areas.
§
Western Australian Planning Commission’s (WAPC) Planning Bulletin No 67-
Guidelines for Wind Farm Development.
§
There are no local policy implications relevant to this item.
FINANCIAL
IMPLICATIONS The applicant has paid a sum of $34,196 and $6,557 allocated to
the Development Assessment Panel.
STRATEGIC IMPLICATIONS
§
Shire of Dandaragan draft Local Planning Strategy
§
Local Planning Strategy - Rural Land Use and Rural Settlement 2012.
ATTACHMENTS
Circulated with the agenda are the following items relevant
to this report:
§
Application Volume 1 (Doc Id: 71441)
§
Application Volume 1 (Doc Id: 71442)
§
Schedule of Submissions (Doc Id: 71996) (Marked 9.4.4) Note – documents 71441
& 71442 have been previously circulated at the Council Forum of 28 July
2016
VOTING REQUIREMENT
Simple majority
OFFICER
RECOMMENDATION / COUNCIL DECISION Moved Cr Scharf, seconded Cr Sheppard
That Council advise the Midwest/Wheatbelt (Central) JDAP that it supports
development for a proposed 80MW Solar Photovoltaic Facility and infrastructure
with recommended conditions at Lots 3899 & 105 Mullering Road, Cataby and
recommends the following:
The Wheatbelt JDAP determines that the use “Solar
Photovoltaic Facility” is consistent with the objectives of the “Rural” zone
and is therefore permitted under section 3.4.2 of the Shire of Dandaragan Local
Planning Scheme No.7. The Wheatbelt JDAP approve Department of Planning
application reference DAP/16/01072 and accompanying plans prepared by Wind
Prospect Pty Ltd dated 1 June 2016 (Revision D) in accordance with Regulation
68 (2) of the deemed provisions Planning and Development (Local Planning
Schemes) Regulations 2015 subject to the following conditions:
1. All development shall accord with the Development
Application Report prepared by Wind Prospect Pty Ltd dated 1 June 2016
(Revision D) and subject to any modifications required as a consequence of any
condition(s) of this approval;
2. The endorsed plans shall not be modified or altered
without the prior approval of the Midwest/Wheatbelt (Central) JDAP in
accordance with Regulation 17 of the Planning and Development (Development
Assessment Panels) Regulations 2011;
3. This decision constitutes planning approval only and is
valid for a period of five years from the date of approval. If the subject
development is not substantially commenced within the three year period, the
approval shall lapse and be of no further effect;
4. The proponent is to prepare, submit and adhere to a Traffic
Management Plan to the requirements Main Roads WA and approval of the Local
Government, with all costs met by the proponent including for condition surveys
and any costs associated with the design, construction and maintenance (over a
specified defect liability period) of identified required upgrades.
5. The Proponent shall prepare a Traffic Feasibility Study
and Delivery Method Statement identifying any roads under the care and control
of the Shire of Dandaragan that may form part of the transport route for
products from the relevant port and / or local manufacturers to the site during
the construction period. Any damage caused to that road(s) by the Proponent or
the Proponent’s contractors shall be repaired at the Proponent’s expense to the
satisfaction of the Shire of Dandaragan.
6. The Proponent shall, at the Proponent’s expense,
construct and drain a sealed access driveway(s) from Mullering Road to the
property boundary to the satisfaction of the Shire of Dandaragan.
7.The Proponent shall prepare and implement a Management
Plan, to the satisfaction of the Shire of Dandaragan, that;
a) minimises the
impact of the approved development on the amenity of the locality due to the
transportation of materials to and from the site;
b) details the temporary land uses, the built form of
structures and the operation and management of those temporary uses;
c) addresses the
Proponents response to fire and emergency incidents;
d) ensures the use of buildings, works and materials on the
site do not generate unreasonable levels of noise, vibration, dust, drainage,
wastewater, waste products or reflected light;
e) manages weed and pest nuisances on the site and in the
locality; and
f) addresses the post construction operations of the site
and the removal of temporary structures;
8. Shire of Dandaragan is to be advised of completion of the
solar facility.
Advice Notes:
1. The Proponent is to liaise with the local school bus
operator to ensure these runs are not disturbed due to increased volumes of
traffic;
2. The proponent may wish to consider providing greater than
minimum fire mitigation strategies to protect against bush fire events;
3. Storage tanks should be fitted with BFB coupling or a
standpipe installed to allow for fast flow;
4. Bulk water supply for fire suppression be made available
to all Emergency Services within the Shire. Building Protection zones and
Firebreaks will have to be adhered to;
5. All designs associated with the proposal are to comply
with the requirements of the Civil Aviation Safety Authority (CASA);
6. In relation to condition 4, prior to the commencement of
any site work, the proponent is responsible to ensure that the Traffic
Management Plan is lodged to Main Roads Mid West-Gascoyne Region for review and
subsequently the Local Government for its approval. The Traffic Management Plan
shall incorporate a Traffic Statement or Assessment (as appropriate) in
accordance with the WAPC guideline, “Transport Assessment Guidelines for
Developments” to ensure that impacts to intersections and the Main Roads
network are addressed. The Traffic Management Plan shall include the
identification of any necessary road upgrading and the provision of a
dilapidation survey prior to and at the completion of the development with any
damage caused to the road network used by transport vehicles accessing the site
to be repaired to the requirements and approval of either Main Roads WA or the
Local Government (this being dependent upon the responsible management
authority of the relevant section of road reserve). Once the Traffic Management
Plan is approved, the proponent from time to time is responsible to ensure that
all installations, activities and processes carried out at all times and in all
respects are in accordance with the Traffic Management Plan;
7. The Shire will not accept any responsibility for the
failure of any pavement constructed by the Proponent within the site;
8. The Proponent is reminded of their obligations under
Section 136 of the Planning & Development Act;
9. The Proponent is advised that components of the project
identified in this approval are located on an adjoining title and securing long
term tenure of that infrastructure is the responsibility of the Proponent;
10. This is planning approval only and a building permit for
temporary and permanent structures must be obtained for this development prior
to construction commencing; and
11. Should the applicant be aggrieved by this decision, or
any conditions imposed, there is a Right to Review under the Planning and
Development Act 2005. An application for Review must be submitted in accordance
with Part XIV of the Planning and Development Act within 28 days of the date of
the decision to the State Administrative Tribunal, GPO Box U1991, PERTH WA
6845. CARRIED 8 / 0